Friday, December 2, 2016

Windows and Roof

Time Lapse Window and Roof Install



From the inside, a 1/2" gap was left between the rough opening and window in order to shim the windows level and plumb. 

Starting to look like a real finished product now!

Painting the drip edge, the only flashing part that wasn't available pre-finished. The dormers and skylights added complexity, so much that 7 different types of flashing had to be used! Only 3 would have been needed for a simple pitch roof.


The eves are the widest part of the house, so double checking that they are under the 8'6" DOT width limitation.



Ready for water barrier and then the finished product.